Fort Collins Utilities Reaches Milestone with Itron DEM Program

Fort Collins Utilities, a municipal distribution utility in Colorado, launched the Peak Partners program in June 2014 in partnership with Itron.…


Developing the Peak Day Dataset Using MetrixLT

I think of MetrixLT as a fancy load shape manipulator and calculator. While the software was originally designed to calibrate load shapes to monthly…


Peak Survey

Itron’s forecasting group is currently conducting an Electric Peak Load Modeling Survey. The purpose of this survey is to gather information about…